N

Graduate (3-6 Month) Intern – Production Cost Modeling and Reliability Analysis

NREL

United States, United States, United States Full time June 19, 2026
Apply Now

Opportunity Description

Description

The National Laboratory of the Rockies (NLR) is seeking a motivated Power System Planning Intern to join the Grid Planning and Analysis Center (GPAC) within the Strategic Energy Analysis and Decision Sciences (SEADS) directorate. SEADS leads cutting-edge energy analysis and grid research, applying advanced modeling and simulation to design, plan, and optimize distribution and bulk power systems. 

As part of GPAC, you’ll support applied research in electric power systems planning—using production cost and resource adequacy models, statistical and data analysis—primarily for transmission planning and data center integration. You’ll collaborate with a dynamic team working with utilities, regulators, and government agencies to deliver insights that enable a reliable, affordable, and resilient grid of the future. 

Key Responsibilities: 

  • Run simulations and analyze data related to production cost and resource ...
  • Full time Engineers

    Ready to Apply?

    Submit your application for Graduate (3-6 Month) Intern – Production Cost Modeling and Reliability Analysis at NREL

    Apply for this Position